WaveLine® Display 10ft S-Curve
WaveLine® Display 10ft S-Curve
Order online & submit artwork via email or upload artwork page
Couldn't load pickup availability
Couldn't load pickup availability
why choose deluxe canopy
- Premium materials & craftsmanship
- Fast lead time
- Free shipping & no setup fee
- Complimentary design service

WaveLine® Display 10ft S-Curve
WL-G-43S
This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with bungee cord snap together to create the base framework, then slide on the pillowcase-like graphic over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. Single or Double-sided.
Kit Includes
- (1) 4x3 Frame Curve - 1-1/4" (32mm) cold-drawn anodized aluminum
- (1) Travel bag - made from 100% recycled materials
- (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
- Single or Double-sided available.Add-on Accessories
- WLM LED Light
- WLM Counter
- WLM Triangular Shelf
- WLM CA700 Case with Counter Conversion
Specifications
- Display Size: 2998mm W x 2260mm H(118"W x 88" H )
- Shipping Size: 350mm W x 315mm D x 815mm H(13.8"W x 12.4"D x 32.1"H)
- Material: Dye-sublimation Stretch Fabric
- Carton Weight: 7.2kg,15.9lb
- Graphic Weight: 3.6kg,7.9lb
- Warranty: One (1) year on hardware and graphics.